Home / Projects / Case Studies /
This included crews with skills set to carry out large size concrete pipe lines.
The project required the installation and back fill of larger storm water pipelines. This included the supply and install of a 1350mm box culvert under the exit from the Link Rd round about under Pakowhai Rd.