This was Drainways first major job as lead contractor to Hastings District Council.
One of the initial challenges was determining the potential for underground service clashes. This required potholing two metres deep to find service locations and then plotting these with GPS to provide council engineers with coordinates for their modelling to ensure the rising main didn’t clash with these existing services.
The project also included a 30-metre section of directional drilling that required two drill shots.