Project / 04

Links Road Roundabout Drainage, Hastings

Drainways was sub contracted to Higgins HB for the storm water portion of the Link Rd Roundabout.

This included crews with skills set to carry out large size concrete pipe lines.

The project required the installation and back fill of larger storm water pipelines. This included the supply and install of a 1350mm box culvert under the exit from the Link Rd round about under Pakowhai Rd.

Read More
  • The installation and backfill of concrete pipes ranged from 300mm, 450mm, 525mm, 750mm and 1200mm.
  • Wing wall and rip rap installation
  • 1050mm Manhole installation
  • Double and single sump installation
  • Sub-Contractor to Higgins for the Storm Water drainage portion of this project
Client Feedback

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

John Smith / Hastings District Council

Project Specifics
  • Project Scale: Medium
  • Project Timeline: Jan 2018 – Mar 2018
  • Budget: $150,000
  • Disciplines: Stormwater Drain Installation
Drinking Water

Frimley Park Water Treatment Plant, Hastings

Drinking Water

Te Mata Road Water Main Replacement, Havelock North

Stormwater

Links Road Roundabout Drainage, Hastings

Wastewater

Park Road Rising Main, Hastings

Subdivision

Gracelands Retirement Village, Hastings

Subdivision

West Place Subdivision, Greenmeadows

To find out more or you have a project requiring our expertise, then get in touch today